Workshop Resources
Total area of various functional processing and auxiliary workshops: 41,500 square meters;
Workshop 1 (blanking): 7,900 square meters;
Workshop 2 (piping system manufacturing): 9,100 square meters;
Workshop 3 (segment fabrication): 9,100 square meters;
Workshop 4: 7,900 square meters;
Zone 5 (comprehensive office area): 5,100 square meters;
Workshop 6 (painting): 2,400 square meters.
The factory area is equipped with a complete gas supply pipeline and gas storage tank area; there are 12 related transportation equipment including forklifts, flatbed trailers, flatbed trucks, tractors, and curved arm trucks.







